The Jericho Diamond Mine is a dormant diamond mine located in Canada's Nunavut territory. Jericho is Nunavut’s first and only diamond mine. It is located 420 km (260 mi) northeast of Yellowknife, Northwest Territories and is accessible by air all year and by winter road from Yellowknife. The project was mined from 2006 to 2008, and produced 780,000 carats (156 kg; 344 lb) of diamonds from 1,200,000 tonnes (1,200,000 long tons; 1,300,000 short tons) of kimberlite mined from the open pit operation. Over $200 million was invested in the development of the Jericho operations including the construction of a 2,000 t (2,000 long tons; 2,200 short tons) per day diamond recovery plant, maintenance facility, fuel farm, and offices and accommodation for 225 personnel.